+8618936869890 

You are here: Home»Products»Hdd Equipment»130Ton Hdd Boring Machine » 130Ton Hdd Boring Machine
PRODUCT CATEGORY

RELATED PRODUCTS

Share to:

130Ton Hdd Boring Machine

Product Details:
Place of Origin: CHINA
Brand Name: DILONG
Model Number: DL1300
Payment & Shipping Terms:
Price: NEED DISCUSS
Delivery Time: After advance payment in 7 days
Availability:

With the use of closed loop of the main rotation hydraulic system, DL1300 crawler integrated horizontal directional drilling machine has better working efficiency, and it has 264Kw engine. Its forced air cooling system enables it to work reliably for a long time. Additionally, its impact structure and sound climbing capacity can make transfer and transportation of the equipment more convenient. High-speed operation system has multi-shift stepless speed regulation function, significantly increasing the operation efficiency. The rotation hydraulic system is of closed loop and the high-strength drill pipe holder is set on the outer side of the crossarm, featuring simplicity, reliability, easy assembly & dis-assembly of drill pipe and high efficiency with the use of 2t hoist. The top-end PALL filter can ensure cleanness of the hydraulic system and long service life of the equipment. Double-wall rock drilling function interface is reserved.


Technical parameter:

Engine power

KW

264/2200


Main machine size

mm

10559x2630x3315

 

Max thrust force

KN

550

Weight

T

28

Max pullback force

KN

1320

Dia.of drilling rod

mm

φ114

Max torque

N.m

42000

Length of drilling rod

m

4.5

Max rotary speed

rpm

100

Max Dia.of pullback pipe

mm

φ1300

Max carriage speed

m/min

30

Max construction length

m

900

Max mud pump flow

L/min

800

Incidence Angle

·

818

Max mud pressure

Mpa

10±0.5

Climbing angle

·

14

 

Stages of the HDD-machine works:


Stage 1 is a preparation step. At this stage it’s necessary to analyze the soil composition, existed underground utilities and other materials. Also at 1st stage is very important to prepare and sign all technical documents for the construction project.


Stage 2 is a pilot boring The pilot hole is drilled from the entry point to the exit point following a previously designed profile and alignment. The drilling tools and rig equipment selected for each job is largely determined based on the results of the geotechnical investigation and the size of the crossing (length and diameter). During the pilot hole drilling, a directional guidance system is used to navigate the pilot hole along its pre-designed profile


Stage 3 is reaming the hole. Hole enlargementIn small diameter crossings the pipeline may be directly installed in the pilot hole. However in most cases pilot hole enlarging, known as “pre-reaming,” will be necessary. Pre-reaming is required to provide a bore diameter large enough so that the pipeline can be installed in the drilled crossing. Based on the final desired diameter and soil conditions this process may include one or more stages.


Stage 4 is Pull back. Once the drilled hole has been enlarged to the required diameter and cleaned adequately, the pipeline is installed. It is final stage of drilling works. The pipeline is dragged into the built horizontal well (borehole). After completing of drilling works, as-built documentation is given to the customer. It is important to choose a suitable drilling rig for carrying out the drilling works of high quality


 


Product Inquiry

ABOUT DILONG

Jiangsu Dilong Heavy Machinery Co., Ltd. is one of the earliest specialized private companies in no-dig industry (HDD) in China. We shall maintain our commitment of creative innovation, strong quality, timely training and consistent service as always, your visit and booking shall be a new start for our long term cooperation.
 

PRODUCT CATEGORY

CONTACT US

   No.19th, East Tuanshan Road, Lishui District, Nanjing City, China
   +8618936869890     

FEEDBACK

FEEDBACK
Copyright © 2019 Jiangsu Dilong Heavy Machinery Co., Ltd.